Mon–Sat 08:30–18:00 (GMT+8) Founded 2009 Dongguan, China

Warehouse expansion adds 1,200 tonnes of covered stock capacity

More racking means deeper stock on the fast-moving grades, which is the only reliable way to keep cut-to-size lead times short.

Company News 3 min read
Warehouse expansion adds 1,200 tonnes of covered stock capacity

We have added 1,200 tonnes of covered storage at the Changping site. The expansion is mostly high-bay racking for rod and tube, plus a humidity-controlled bay for nylon and POM.

The commercial reason is lead time. Stock depth is the only real lever on cut-to-size turnaround — a saw can only cut what is on the floor. Where we hold six months of cover on a grade, a customer can order on Monday and ship on Wednesday. Where we hold two weeks, the same order turns into a purchase order and a six-week wait.

Humidity control is the less obvious half. Nylon and acetal absorb moisture from the air, and a rod that has been sitting in a damp warehouse machines differently from one that has been kept dry. The new bay holds relative humidity in a controlled band so that dimensional behaviour is repeatable from one delivery to the next.

Need a material recommendation?

Send us the application and we will reply with two or three candidate grades and a price.

Ask an engineer
Share this article

Send us your drawing, get a price in 24 hours

Tell us the material, the size and how many pieces. If you are not sure about the material, describe the application and we will recommend one.

Request a quote Browse stock shapes