
We have added 1,200 tonnes of covered storage at the Changping site. The expansion is mostly high-bay racking for rod and tube, plus a humidity-controlled bay for nylon and POM.
The commercial reason is lead time. Stock depth is the only real lever on cut-to-size turnaround — a saw can only cut what is on the floor. Where we hold six months of cover on a grade, a customer can order on Monday and ship on Wednesday. Where we hold two weeks, the same order turns into a purchase order and a six-week wait.
Humidity control is the less obvious half. Nylon and acetal absorb moisture from the air, and a rod that has been sitting in a damp warehouse machines differently from one that has been kept dry. The new bay holds relative humidity in a controlled band so that dimensional behaviour is repeatable from one delivery to the next.
Need a material recommendation?
Send us the application and we will reply with two or three candidate grades and a price.
