Mon–Sat 08:30–18:00 (GMT+8) Founded 2009 Dongguan, China

PEEK material price in India vs China: landed cost, not list price

Importers compare rupees per kilogram and then discover that duty, freight and lead time moved the number. Here is the arithmetic, layer by layer, with a worked example.

Industry Focus 9 min read
PEEK material price in India vs China: landed cost, not list price

Every PEEK enquiry from India starts the same way: what is your price per kilogram, and how does it compare with what we pay now. The honest answer is that the quoted price is the least interesting number in the comparison. Between a mill price in China and a delivered kilogram in Pune there are five layers, and two of them are larger than the difference most buyers are trying to negotiate.

This article breaks the layers down, works a 100 kg example end to end, and sets out the cases where a higher local price is still the cheaper decision.

Layer one: the mill price is a function of grade, form and quantity

PEEK is not one price. Unfilled natural rod, glass filled sheet, carbon filled and bearing grades sit at different levels, and within one grade the price per kilogram falls with quantity and rises with unusual dimensions. A 20 mm rod off a distributor’s shelf can carry 30 to 40 percent on top of the mill price for the same material in a 500 kg lot.

Before comparing countries, fix the basis: same grade, same form, same dimensions, same quantity, same Incoterm. Most “China is cheaper” or “India is cheaper” conclusions collapse at this step because the two quotes describe different products.

Layer two: what the export price actually includes

A Chinese domestic quote includes 13 percent VAT. An export quote is normally zero-rated, so the number you receive should not contain it. When a supplier quotes an export price that looks identical to the domestic price, either the VAT treatment is wrong or the domestic price was already net.

The export price also carries packing for sea freight, mill certificates, and often a minimum lot size. PEEK semi-finished shapes are dense and heavy, so packing is simple, but documentation is not free: a certificate of analysis, a batch traceability sheet and a fumigation-free packing declaration are all part of the delivered cost.

Layer three: freight, and why density works in your favour

PEEK has a specific gravity around 1.3, so a cubic metre weighs about 1,300 kg. That makes it one of the few engineering materials where sea freight is almost irrelevant per kilogram: an LCL rate of USD 150 per cubic metre works out at roughly USD 0.12 per kilogram.

Air freight changes the picture completely. At USD 5 per kilogram, air adds 5 to 8 percent to a material that costs USD 60 to 90 per kilogram. Air is justified when a line is down or when a sample is needed in a week, not for routine replenishment.

Cost layer Typical basis Effect on a 100 kg lot
Mill price, 20 mm unfilled rod per kg, ex-works the reference number
Export packing and documents per shipment small, but fixed, so it hurts small lots
Sea freight, LCL per cubic metre about 0.1 to 0.2 percent per kg
Basic customs duty percentage of CIF value the largest single addition
Social welfare surcharge percentage of the duty small but unavoidable
IGST percentage of CIF plus duty recoverable as input credit for a registered buyer
Customs clearance and inland freight per shipment fixed, so it hurts small lots

Layer four: duty is where the comparison is usually decided

PEEK rod and sheet are classified in the plastic chapters, and Indian customs duty on semi-finished plastic shapes is commonly assessed at 7.5 percent basic customs duty, plus a social welfare surcharge of 10 percent of that duty, plus IGST at 18 percent on the duty-paid value. The IGST is recoverable as input tax credit for a registered manufacturer, so it is a cash-flow item rather than a cost. The basic duty and the surcharge are real cost.

Two practical points follow. First, the classification matters: a PEEK part that has been machined into a component may fall under a different line from PEEK rod, with a different rate, and getting it wrong produces either an overpayment or a customs notice six months later. Second, there is no preferential rate to claim between India and China: India is not part of RCEP, so a certificate of origin does not reduce the duty.

Layer five: the costs that never appear on the invoice

Lead time. Sea freight from a Chinese port to Nhava Sheva is typically four to six weeks door to door, plus production time. That inventory is working capital, and if the part is a production input it is also a stocking decision.

Minimum order quantity. A mill lot is often 500 kg or more. Buying 100 kg means either paying a distributor premium or holding stock you do not need yet.

Cut charges. Non-standard dimensions are cut to order and charged per cut. A buyer who needs 20 pieces of 300 mm from a 1,000 mm rod pays for the cutting and for the offcut.

Reject handling. A dimensional reject on an imported lot is a six-week argument. On a domestic lot it is a phone call and a replacement this week.

Payment. A letter of credit costs 0.5 to 1.5 percent, and a forward contract to fix the rupee cost is another small charge that rarely appears in the comparison.

A worked example

One hundred kilograms of 20 mm unfilled natural PEEK rod, imported from China to Maharashtra, compared with the same material from local stock. Figures are indicative of late 2026 and are meant to show the structure, not to quote a price.

Line Import, USD per kg Local stock, USD per kg
Material price 62.00 88.00
Export packing and documents 0.60 included
Sea freight and insurance 1.90 included
Basic customs duty at 7.5 percent of CIF 4.84 already paid upstream
Social welfare surcharge 0.48 already paid upstream
Clearance, CHA and inland freight 1.20 included
Landed cost before tax 71.02 88.00
Lead time 5 to 7 weeks 2 to 5 days

The import route lands about 19 percent below local stock. That is a real saving, and it is smaller than the 30 percent gap the two list prices suggest, because duty and fixed costs consumed a third of it. Whether 19 percent pays for six weeks of inventory and the loss of a same-week replacement depends entirely on how the part is used.

When the local price is the cheaper decision

  • Breakdown or trial quantities. Ten kilograms of anything does not justify an import shipment; fixed costs per kilogram overwhelm the material saving.
  • Line-down situations. A five-week lead time is not a supply option when a machine is stopped.
  • Parts with tight dimensional acceptance. When a lot is likely to generate a dimensional argument, having the supplier in the same country changes the cost of that argument.
  • Regulated end uses. Where the customer audits the material chain, a local stockholder with traceable documentation is worth more than the price difference.
  • Cash-constrained periods. Paying 19 percent less but five weeks earlier is not a saving if the working capital is not available.

How to compare two quotes properly

Ask every supplier for the same eight items, in writing:

  • Grade and manufacturer, with the mill name, not just “PEEK 1000”.
  • Form and dimensions, with the cut plan if the part is not a standard length.
  • Incoterm and the exact point of delivery.
  • Quantity and the price break above it.
  • Lead time from order to delivery at your gate, not from order to dispatch.
  • Documents supplied: certificate of analysis, batch traceability, food contact or medical documentation if relevant.
  • Payment terms and the cost of any instrument required.
  • Replacement policy for dimensional or grade rejects, and who pays the freight.

A quote that answers four of these is a price. A quote that answers all eight is a cost, and only costs can be compared.

One warning about the cheapest offer

PEEK at 25 percent below the market is usually one of four things: regrind or reprocessed material sold as virgin, a different grade described loosely, a thinner or undersized stock sold at nominal dimensions, or material with no mill traceability. Each of them costs more than the saving the first time a part fails a dimensional check or a customer audit.

Questions we get from Indian buyers

Is it cheaper to buy PEEK from China or from a local distributor? For 100 kg and above of a standard size, importing usually lands 15 to 20 percent below local stock. Below about 30 kg, the fixed costs usually erase the advantage.

Can you supply cut-to-size so we avoid the cut charge locally? Yes, we cut to length at origin, and the cut charge is quoted per piece so it can be compared with the local charge rather than hidden in the price.

Which documents come with the shipment? Certificate of analysis, batch traceability, packing list, commercial invoice, and food contact or medical documentation where the grade supports it.

What is the minimum order? From one sheet or rod for a trial, with the per-kilogram price stepping down at 100 kg, 500 kg and one tonne.

Top Plastic quotes PEEK in six languages and ships to Indian ports with cut-to-size service and full mill documentation. Send the grade, the dimensions and the annual quantity, and we will return a landed-cost sheet rather than a list price, so the comparison against your local supplier is on the number you actually pay.

Need a material recommendation?

Send us the application and we will reply with two or three candidate grades and a price.

Ask an engineer
Share this article

Send us your drawing, get a price in 24 hours

Tell us the material, the size and how many pieces. If you are not sure about the material, describe the application and we will recommend one.

Request a quote Browse stock shapes